{"id":444194,"date":"2007-08-01T10:13:35","date_gmt":"2007-08-01T10:13:35","guid":{"rendered":"http:\/\/www.moldova.org\/en\/?p=444194"},"modified":"2017-08-04T16:29:17","modified_gmt":"2017-08-04T16:29:17","slug":"ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end","status":"publish","type":"post","link":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/","title":{"rendered":"Ilan Shor&#8217;s program in action &#8211; Reconstruction and modernization of 5 streets from Orhei is nearing its end"},"content":{"rendered":"<span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> 2<\/span> <span class=\"rt-label rt-postfix\">minutes<\/span><\/span><p>Additionally, besides the renewal of the roadway, the curbs were also changed, as well as the adjoining streets adjacent to the entrances to the residential courtyards and adjacent areas. After completion of these works, new road markings will be applied. It is noteworthy that the large-scale reconstruction of the roads is carried out simultaneously on the 5 streets of Orhei: Junimii, Maxim Gorki, Sportivilor, Alexandru cel Bun and the road Maxim Gorki, arteries that interact with the main street Vasile Lupu and are located in the adjacent area Orhei Lake.<\/p>\n<p>High-quality building materials are used for the extensive reconstruction of the roads. In total, over 2,000 tons of asphalt will be used.<\/p>\n<p>Also, at the indication of Ilan Shor, it will soon be procured its own asphalt and pavement plant, which will reduce costs, create new jobs, but will also allow the city to pave the roads with its own production.<\/p>\n<p>Thus, Orhei becomes the only city in the country that not only modernizes and implements major infrastructure projects but also uses its own human, technical and financial resources.<\/p>\n<p>Infrastructure development, including roads and sidewalks, is a priority for the Mayor Ilan Shor and his team.<\/p>\n<p>According to the action plan promoted by the Mayor of Orhei in 2017, the works of modernization and rehabilitation of the roads will continue on the streets of Vasile Mahu, Gheorghe Asachi, Ciprian Porumbescu, Chisinau, Renasterii Nationale, Doina and Ion Aldea Teodorovici, Parfionov and the street that leads to the Jewish Cemetery (the cemetery will also be landscaped), as well as the streets of Constantin Brancusi, Dimo Street and the road to Ivanos Park.<\/p>\n<p>At the same time, the main artery of Orhei, Vasile Lupu Street, will enter into the major repair and modernization.<\/p>\n<p>We remind that in the last two years, with the arrival of Ilan Shor, as the mayor of Orhei, about 30 kilometers of road and six kilometers of sidewalks were rebuilt, and in some parts of the city where the streets were practically non-existent, they were paved for the first time.<\/p>\n<p>The modernization and rehabilitation of the roads in Orhei municipality is a basic priority for Mayor Ilan Shor and his team, which objectives were presented on March 01<sup>st<\/sup>\u00a0by the &#8220;For Orhei&#8221; faction in front of the town&#8217;s inhabitants. The development of Orhei&#8217;s infrastructure and raising the standards of living are also found in the electoral program presented by the Mayor Ilan Shor in 2015, which he has successfully implemented so far.<\/p>\n","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> 2<\/span> <span class=\"rt-label rt-postfix\">minutes<\/span><\/span>Additionally, besides the renewal of the roadway, the curbs were also changed, as well as the adjoining streets adjacent to the entrances to the residential courtyards and adjacent areas. After completion of these works, new road markings will be applied. It is noteworthy that the large-scale reconstruction of the roads is carried out simultaneously on [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":444195,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-444194","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-miscellaneous"],"content_social_share":"<span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> 2<\/span> <span class=\"rt-label rt-postfix\">minutes<\/span><\/span><p>Additionally, besides the renewal of the roadway, the curbs were also changed, as well as the adjoining streets adjacent to the entrances to the residential courtyards and adjacent areas. After completion of these works, new road markings will be applied. It is noteworthy that the large-scale reconstruction of the roads is carried out simultaneously on the 5 streets of Orhei: Junimii, Maxim Gorki, Sportivilor, Alexandru cel Bun and the road Maxim Gorki, arteries that interact with the main street Vasile Lupu and are located in the adjacent area Orhei Lake.<\/p>\n<p>High-quality building materials are used for the extensive reconstruction of the roads. In total, over 2,000 tons of asphalt will be used.<\/p>\n<p>Also, at the indication of Ilan Shor, it will soon be procured its own asphalt and pavement plant, which will reduce costs, create new jobs, but will also allow the city to pave the roads with its own production.<\/p>\n<p>Thus, Orhei becomes the only city in the country that not only modernizes and implements major infrastructure projects but also uses its own human, technical and financial resources.<\/p>\n<p>Infrastructure development, including roads and sidewalks, is a priority for the Mayor Ilan Shor and his team.<\/p>\n<p>According to the action plan promoted by the Mayor of Orhei in 2017, the works of modernization and rehabilitation of the roads will continue on the streets of Vasile Mahu, Gheorghe Asachi, Ciprian Porumbescu, Chisinau, Renasterii Nationale, Doina and Ion Aldea Teodorovici, Parfionov and the street that leads to the Jewish Cemetery (the cemetery will also be landscaped), as well as the streets of Constantin Brancusi, Dimo Street and the road to Ivanos Park.<\/p>\n<p>At the same time, the main artery of Orhei, Vasile Lupu Street, will enter into the major repair and modernization.<\/p>\n<p>We remind that in the last two years, with the arrival of Ilan Shor, as the mayor of Orhei, about 30 kilometers of road and six kilometers of sidewalks were rebuilt, and in some parts of the city where the streets were practically non-existent, they were paved for the first time.<\/p>\n<p>The modernization and rehabilitation of the roads in Orhei municipality is a basic priority for Mayor Ilan Shor and his team, which objectives were presented on March 01<sup>st<\/sup>\u00a0by the &#8220;For Orhei&#8221; faction in front of the town&#8217;s inhabitants. The development of Orhei&#8217;s infrastructure and raising the standards of living are also found in the electoral program presented by the Mayor Ilan Shor in 2015, which he has successfully implemented so far.<\/p>\n<div class='heateorSssClear'><\/div><div  class='heateor_sss_sharing_container heateor_sss_horizontal_sharing' data-heateor-sss-href='https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/' data-heateor-sss-no-counts=\"1\"><div class='heateor_sss_sharing_title' style=\"font-weight:bold\" ><\/div><div class=\"heateor_sss_sharing_ul\"><a aria-label=\"Facebook\" class=\"heateor_sss_facebook\" href=\"https:\/\/www.facebook.com\/sharer\/sharer.php?u=https%3A%2F%2Fwww.moldova.org%2Fen%2Filan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end%2F\" title=\"Facebook\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg\" style=\"background-color:#0765FE;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M28 16c0-6.627-5.373-12-12-12S4 9.373 4 16c0 5.628 3.875 10.35 9.101 11.647v-7.98h-2.474V16H13.1v-1.58c0-4.085 1.849-5.978 5.859-5.978.76 0 2.072.15 2.608.298v3.325c-.283-.03-.775-.045-1.386-.045-1.967 0-2.728.745-2.728 2.683V16h3.92l-.673 3.667h-3.247v8.245C23.395 27.195 28 22.135 28 16Z\"><\/path><\/svg><\/span><\/a><a aria-label=\"Twitter\" class=\"heateor_sss_button_twitter\" href=\"https:\/\/twitter.com\/intent\/tweet?text=Ilan%20Shor%27s%20program%20in%20action%20-%20Reconstruction%20and%20modernization%20of%205%20streets%20from%20Orhei%20is%20nearing%20its%20end&url=https%3A%2F%2Fwww.moldova.org%2Fen%2Filan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end%2F\" title=\"Twitter\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_twitter\" style=\"background-color:#55acee;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-4 -4 39 39\"><path d=\"M28 8.557a9.913 9.913 0 0 1-2.828.775 4.93 4.93 0 0 0 2.166-2.725 9.738 9.738 0 0 1-3.13 1.194 4.92 4.92 0 0 0-3.593-1.55 4.924 4.924 0 0 0-4.794 6.049c-4.09-.21-7.72-2.17-10.15-5.15a4.942 4.942 0 0 0-.665 2.477c0 1.71.87 3.214 2.19 4.1a4.968 4.968 0 0 1-2.23-.616v.06c0 2.39 1.7 4.38 3.952 4.83-.414.115-.85.174-1.297.174-.318 0-.626-.03-.928-.086a4.935 4.935 0 0 0 4.6 3.42 9.893 9.893 0 0 1-6.114 2.107c-.398 0-.79-.023-1.175-.068a13.953 13.953 0 0 0 7.55 2.213c9.056 0 14.01-7.507 14.01-14.013 0-.213-.005-.426-.015-.637.96-.695 1.795-1.56 2.455-2.55z\" fill=\"#fff\"><\/path><\/svg><\/span><\/a><a aria-label=\"Odnoklassniki\" class=\"heateor_sss_button_odnoklassniki\" href=\"https:\/\/connect.ok.ru\/dk?cmd=WidgetSharePreview&st.cmd=WidgetSharePreview&st.shareUrl=https%3A%2F%2Fwww.moldova.org%2Fen%2Filan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end%2F&st.client_id=-1\" title=\"Odnoklassniki\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_odnoklassniki\" style=\"background-color:#f2720c;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M16 16.16a6.579 6.579 0 0 1-6.58-6.58A6.578 6.578 0 0 1 16 3a6.58 6.58 0 1 1 .002 13.16zm0-9.817a3.235 3.235 0 0 0-3.236 3.237 3.234 3.234 0 0 0 3.237 3.236 3.236 3.236 0 1 0 .004-6.473zm7.586 10.62c.647 1.3-.084 1.93-1.735 2.99-1.395.9-3.313 1.238-4.564 1.368l1.048 1.05 3.877 3.88c.59.59.59 1.543 0 2.133l-.177.18c-.59.59-1.544.59-2.134 0l-3.88-3.88-3.877 3.88c-.59.59-1.543.59-2.135 0l-.176-.18a1.505 1.505 0 0 1 0-2.132l3.88-3.877 1.042-1.046c-1.25-.127-3.19-.465-4.6-1.37-1.65-1.062-2.38-1.69-1.733-2.99.37-.747 1.4-1.367 2.768-.29C13.035 18.13 16 18.13 16 18.13s2.968 0 4.818-1.456c1.368-1.077 2.4-.457 2.768.29z\"><\/path><\/svg><\/span><\/a><a aria-label=\"Telegram\" class=\"heateor_sss_button_telegram\" href=\"https:\/\/telegram.me\/share\/url?url=https%3A%2F%2Fwww.moldova.org%2Fen%2Filan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end%2F&text=Ilan%20Shor%27s%20program%20in%20action%20-%20Reconstruction%20and%20modernization%20of%205%20streets%20from%20Orhei%20is%20nearing%20its%20end\" title=\"Telegram\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_telegram\" style=\"background-color:#3da5f1;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M25.515 6.896L6.027 14.41c-1.33.534-1.322 1.276-.243 1.606l5 1.56 1.72 5.66c.226.625.115.873.77.873.506 0 .73-.235 1.012-.51l2.43-2.363 5.056 3.734c.93.514 1.602.25 1.834-.863l3.32-15.638c.338-1.363-.52-1.98-1.41-1.577z\"><\/path><\/svg><\/span><\/a><\/div><div class=\"heateorSssClear\"><\/div><\/div><div class='heateorSssClear'><\/div>","yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Ilan Shor&#039;s program in action - Reconstruction and modernization of 5 streets from Orhei is nearing its end - Moldova.org<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Oxana Greadcenco\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\\\/\"},\"author\":{\"name\":\"Oxana Greadcenco\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#\\\/schema\\\/person\\\/e4a420bf1d318b74ebd369e44b6b3cca\"},\"headline\":\"Ilan Shor&#8217;s program in action &#8211; Reconstruction and modernization of 5 streets from Orhei is nearing its end\",\"datePublished\":\"2007-08-01T10:13:35+00:00\",\"dateModified\":\"2017-08-04T16:29:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\\\/\"},\"wordCount\":425,\"image\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2017\\\/08\\\/20542769_10211384033095040_317143379_o_2186686.jpg\",\"articleSection\":[\"Miscellaneous\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\\\/\",\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\\\/\",\"name\":\"Ilan Shor's program in action - Reconstruction and modernization of 5 streets from Orhei is nearing its end - Moldova.org\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2017\\\/08\\\/20542769_10211384033095040_317143379_o_2186686.jpg\",\"datePublished\":\"2007-08-01T10:13:35+00:00\",\"dateModified\":\"2017-08-04T16:29:17+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#\\\/schema\\\/person\\\/e4a420bf1d318b74ebd369e44b6b3cca\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.moldova.org\\\/en\\\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2017\\\/08\\\/20542769_10211384033095040_317143379_o_2186686.jpg\",\"contentUrl\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2017\\\/08\\\/20542769_10211384033095040_317143379_o_2186686.jpg\",\"width\":1024,\"height\":682},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ilan Shor&#8217;s program in action &#8211; Reconstruction and modernization of 5 streets from Orhei is nearing its end\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/\",\"name\":\"Moldova.org\",\"description\":\"The first news website of Moldova\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#\\\/schema\\\/person\\\/e4a420bf1d318b74ebd369e44b6b3cca\",\"name\":\"Oxana Greadcenco\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/37904b39532910b2c60610d450204113a0a3673289ea239b522abc313d9d5bfc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/37904b39532910b2c60610d450204113a0a3673289ea239b522abc313d9d5bfc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/37904b39532910b2c60610d450204113a0a3673289ea239b522abc313d9d5bfc?s=96&d=mm&r=g\",\"caption\":\"Oxana Greadcenco\"},\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/author\\\/ogreadcenco\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ilan Shor's program in action - Reconstruction and modernization of 5 streets from Orhei is nearing its end - Moldova.org","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/","twitter_misc":{"Written by":"Oxana Greadcenco","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/#article","isPartOf":{"@id":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/"},"author":{"name":"Oxana Greadcenco","@id":"https:\/\/www.moldova.org\/en\/#\/schema\/person\/e4a420bf1d318b74ebd369e44b6b3cca"},"headline":"Ilan Shor&#8217;s program in action &#8211; Reconstruction and modernization of 5 streets from Orhei is nearing its end","datePublished":"2007-08-01T10:13:35+00:00","dateModified":"2017-08-04T16:29:17+00:00","mainEntityOfPage":{"@id":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/"},"wordCount":425,"image":{"@id":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/#primaryimage"},"thumbnailUrl":"https:\/\/www.moldova.org\/en\/wp-content\/uploads\/sites\/2\/2017\/08\/20542769_10211384033095040_317143379_o_2186686.jpg","articleSection":["Miscellaneous"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/","url":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/","name":"Ilan Shor's program in action - Reconstruction and modernization of 5 streets from Orhei is nearing its end - Moldova.org","isPartOf":{"@id":"https:\/\/www.moldova.org\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/#primaryimage"},"image":{"@id":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/#primaryimage"},"thumbnailUrl":"https:\/\/www.moldova.org\/en\/wp-content\/uploads\/sites\/2\/2017\/08\/20542769_10211384033095040_317143379_o_2186686.jpg","datePublished":"2007-08-01T10:13:35+00:00","dateModified":"2017-08-04T16:29:17+00:00","author":{"@id":"https:\/\/www.moldova.org\/en\/#\/schema\/person\/e4a420bf1d318b74ebd369e44b6b3cca"},"breadcrumb":{"@id":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/#primaryimage","url":"https:\/\/www.moldova.org\/en\/wp-content\/uploads\/sites\/2\/2017\/08\/20542769_10211384033095040_317143379_o_2186686.jpg","contentUrl":"https:\/\/www.moldova.org\/en\/wp-content\/uploads\/sites\/2\/2017\/08\/20542769_10211384033095040_317143379_o_2186686.jpg","width":1024,"height":682},{"@type":"BreadcrumbList","@id":"https:\/\/www.moldova.org\/en\/ilan-shors-program-action-reconstruction-modernization-5-streets-orhei-nearing-end\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.moldova.org\/en\/"},{"@type":"ListItem","position":2,"name":"Ilan Shor&#8217;s program in action &#8211; Reconstruction and modernization of 5 streets from Orhei is nearing its end"}]},{"@type":"WebSite","@id":"https:\/\/www.moldova.org\/en\/#website","url":"https:\/\/www.moldova.org\/en\/","name":"Moldova.org","description":"The first news website of Moldova","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.moldova.org\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.moldova.org\/en\/#\/schema\/person\/e4a420bf1d318b74ebd369e44b6b3cca","name":"Oxana Greadcenco","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/37904b39532910b2c60610d450204113a0a3673289ea239b522abc313d9d5bfc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/37904b39532910b2c60610d450204113a0a3673289ea239b522abc313d9d5bfc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/37904b39532910b2c60610d450204113a0a3673289ea239b522abc313d9d5bfc?s=96&d=mm&r=g","caption":"Oxana Greadcenco"},"url":"https:\/\/www.moldova.org\/en\/author\/ogreadcenco\/"}]}},"_links":{"self":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/posts\/444194","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/comments?post=444194"}],"version-history":[{"count":0,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/posts\/444194\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/media\/444195"}],"wp:attachment":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/media?parent=444194"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/categories?post=444194"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/tags?post=444194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}