{"id":259901,"date":"2009-04-15T09:10:24","date_gmt":"2009-04-15T09:10:24","guid":{"rendered":"http:\/\/new.moldova.org\/2009\/04\/15\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/"},"modified":"2009-04-15T09:10:24","modified_gmt":"2009-04-15T09:10:24","slug":"the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng","status":"publish","type":"post","link":"https:\/\/www.moldova.org\/en\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/","title":{"rendered":"The rehabilitation of Chisinau-Hincesti road requires 13 mln euro"},"content":{"rendered":"<span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> &lt; 1<\/span> <span class=\"rt-label rt-postfix\">minute<\/span><\/span><p>The Ministry of Constructions and Territorial Development (MCTD) announces about the start of the repair works on the Chisinau-Hincesti road segment.<\/p>\n<p>The road rehabilitation is carried out by the Finnish company &ldquo;Lemminkainen Infra Oy&rdquo;, based on the contract signed with the State Road Administration on 19 January 2009.<\/p>\n<p>The total length of the road sector subject to repair is of 22.1 km. The rehabilitation of this sector will be carried out in two stages. Firstly, the rehabilitation of the first 14 km will take place, and then it is planned to rehabilitate the rest of 8 km of the road with financing on the account of the second trench of the loan offered by the European Investment Bank. The cost of works under the first stage is of 13.4 mln euro.<\/p>\n<p>According to the cited source, the capital repair of the roads will include the rehabilitation works of the road coat, engineer structures and works for the consolidation of the embankment on the damaged sectors. Also, the road parameters will be improved by adding an additional band on the road segment spreading on 9 km.<\/p>\n<p>The road rehabilitation works are financed from the sources of the EIB loan and will last two years.<\/p>\n","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> &lt; 1<\/span> <span class=\"rt-label rt-postfix\">minute<\/span><\/span>The first stage of Chisinau-Hincesti road rehabilitation to require over 13 mln euro<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-259901","post","type-post","status-publish","format-standard","hentry","category-economy"],"content_social_share":"<span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> &lt; 1<\/span> <span class=\"rt-label rt-postfix\">minute<\/span><\/span><p>The Ministry of Constructions and Territorial Development (MCTD) announces about the start of the repair works on the Chisinau-Hincesti road segment.<\/p>\n<p>The road rehabilitation is carried out by the Finnish company &ldquo;Lemminkainen Infra Oy&rdquo;, based on the contract signed with the State Road Administration on 19 January 2009.<\/p>\n<p>The total length of the road sector subject to repair is of 22.1 km. The rehabilitation of this sector will be carried out in two stages. Firstly, the rehabilitation of the first 14 km will take place, and then it is planned to rehabilitate the rest of 8 km of the road with financing on the account of the second trench of the loan offered by the European Investment Bank. The cost of works under the first stage is of 13.4 mln euro.<\/p>\n<p>According to the cited source, the capital repair of the roads will include the rehabilitation works of the road coat, engineer structures and works for the consolidation of the embankment on the damaged sectors. Also, the road parameters will be improved by adding an additional band on the road segment spreading on 9 km.<\/p>\n<p>The road rehabilitation works are financed from the sources of the EIB loan and will last two years.<\/p>\n<div class='heateorSssClear'><\/div><div  class='heateor_sss_sharing_container heateor_sss_horizontal_sharing' data-heateor-sss-href='https:\/\/www.moldova.org\/en\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/' data-heateor-sss-no-counts=\"1\"><div class='heateor_sss_sharing_title' style=\"font-weight:bold\" ><\/div><div class=\"heateor_sss_sharing_ul\"><a aria-label=\"Facebook\" class=\"heateor_sss_facebook\" href=\"https:\/\/www.facebook.com\/sharer\/sharer.php?u=https%3A%2F%2Fwww.moldova.org%2Fen%2Fthe-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng%2F\" title=\"Facebook\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg\" style=\"background-color:#0765FE;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M28 16c0-6.627-5.373-12-12-12S4 9.373 4 16c0 5.628 3.875 10.35 9.101 11.647v-7.98h-2.474V16H13.1v-1.58c0-4.085 1.849-5.978 5.859-5.978.76 0 2.072.15 2.608.298v3.325c-.283-.03-.775-.045-1.386-.045-1.967 0-2.728.745-2.728 2.683V16h3.92l-.673 3.667h-3.247v8.245C23.395 27.195 28 22.135 28 16Z\"><\/path><\/svg><\/span><\/a><a aria-label=\"Twitter\" class=\"heateor_sss_button_twitter\" href=\"https:\/\/twitter.com\/intent\/tweet?text=The%20rehabilitation%20of%20Chisinau-Hincesti%20road%20requires%2013%20mln%20euro&url=https%3A%2F%2Fwww.moldova.org%2Fen%2Fthe-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng%2F\" title=\"Twitter\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_twitter\" style=\"background-color:#55acee;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-4 -4 39 39\"><path d=\"M28 8.557a9.913 9.913 0 0 1-2.828.775 4.93 4.93 0 0 0 2.166-2.725 9.738 9.738 0 0 1-3.13 1.194 4.92 4.92 0 0 0-3.593-1.55 4.924 4.924 0 0 0-4.794 6.049c-4.09-.21-7.72-2.17-10.15-5.15a4.942 4.942 0 0 0-.665 2.477c0 1.71.87 3.214 2.19 4.1a4.968 4.968 0 0 1-2.23-.616v.06c0 2.39 1.7 4.38 3.952 4.83-.414.115-.85.174-1.297.174-.318 0-.626-.03-.928-.086a4.935 4.935 0 0 0 4.6 3.42 9.893 9.893 0 0 1-6.114 2.107c-.398 0-.79-.023-1.175-.068a13.953 13.953 0 0 0 7.55 2.213c9.056 0 14.01-7.507 14.01-14.013 0-.213-.005-.426-.015-.637.96-.695 1.795-1.56 2.455-2.55z\" fill=\"#fff\"><\/path><\/svg><\/span><\/a><a aria-label=\"Odnoklassniki\" class=\"heateor_sss_button_odnoklassniki\" href=\"https:\/\/connect.ok.ru\/dk?cmd=WidgetSharePreview&st.cmd=WidgetSharePreview&st.shareUrl=https%3A%2F%2Fwww.moldova.org%2Fen%2Fthe-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng%2F&st.client_id=-1\" title=\"Odnoklassniki\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_odnoklassniki\" style=\"background-color:#f2720c;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M16 16.16a6.579 6.579 0 0 1-6.58-6.58A6.578 6.578 0 0 1 16 3a6.58 6.58 0 1 1 .002 13.16zm0-9.817a3.235 3.235 0 0 0-3.236 3.237 3.234 3.234 0 0 0 3.237 3.236 3.236 3.236 0 1 0 .004-6.473zm7.586 10.62c.647 1.3-.084 1.93-1.735 2.99-1.395.9-3.313 1.238-4.564 1.368l1.048 1.05 3.877 3.88c.59.59.59 1.543 0 2.133l-.177.18c-.59.59-1.544.59-2.134 0l-3.88-3.88-3.877 3.88c-.59.59-1.543.59-2.135 0l-.176-.18a1.505 1.505 0 0 1 0-2.132l3.88-3.877 1.042-1.046c-1.25-.127-3.19-.465-4.6-1.37-1.65-1.062-2.38-1.69-1.733-2.99.37-.747 1.4-1.367 2.768-.29C13.035 18.13 16 18.13 16 18.13s2.968 0 4.818-1.456c1.368-1.077 2.4-.457 2.768.29z\"><\/path><\/svg><\/span><\/a><a aria-label=\"Telegram\" class=\"heateor_sss_button_telegram\" href=\"https:\/\/telegram.me\/share\/url?url=https%3A%2F%2Fwww.moldova.org%2Fen%2Fthe-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng%2F&text=The%20rehabilitation%20of%20Chisinau-Hincesti%20road%20requires%2013%20mln%20euro\" title=\"Telegram\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_telegram\" style=\"background-color:#3da5f1;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M25.515 6.896L6.027 14.41c-1.33.534-1.322 1.276-.243 1.606l5 1.56 1.72 5.66c.226.625.115.873.77.873.506 0 .73-.235 1.012-.51l2.43-2.363 5.056 3.734c.93.514 1.602.25 1.834-.863l3.32-15.638c.338-1.363-.52-1.98-1.41-1.577z\"><\/path><\/svg><\/span><\/a><\/div><div class=\"heateorSssClear\"><\/div><\/div><div class='heateorSssClear'><\/div>","yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The rehabilitation of Chisinau-Hincesti road requires 13 mln euro - Moldova.org<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.moldova.org\/en\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Autor invitat\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\\\/\"},\"author\":{\"name\":\"Autor invitat\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#\\\/schema\\\/person\\\/e590ccdfbd35fcd038aaf1b84370dadd\"},\"headline\":\"The rehabilitation of Chisinau-Hincesti road requires 13 mln euro\",\"datePublished\":\"2009-04-15T09:10:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\\\/\"},\"wordCount\":206,\"articleSection\":[\"Economy\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\\\/\",\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\\\/\",\"name\":\"The rehabilitation of Chisinau-Hincesti road requires 13 mln euro - Moldova.org\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#website\"},\"datePublished\":\"2009-04-15T09:10:24+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#\\\/schema\\\/person\\\/e590ccdfbd35fcd038aaf1b84370dadd\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.moldova.org\\\/en\\\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The rehabilitation of Chisinau-Hincesti road requires 13 mln euro\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/\",\"name\":\"Moldova.org\",\"description\":\"The first news website of Moldova\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#\\\/schema\\\/person\\\/e590ccdfbd35fcd038aaf1b84370dadd\",\"name\":\"Autor invitat\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g\",\"caption\":\"Autor invitat\"},\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The rehabilitation of Chisinau-Hincesti road requires 13 mln euro - Moldova.org","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.moldova.org\/en\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/","twitter_misc":{"Written by":"Autor invitat","Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.moldova.org\/en\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/#article","isPartOf":{"@id":"https:\/\/www.moldova.org\/en\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/"},"author":{"name":"Autor invitat","@id":"https:\/\/www.moldova.org\/en\/#\/schema\/person\/e590ccdfbd35fcd038aaf1b84370dadd"},"headline":"The rehabilitation of Chisinau-Hincesti road requires 13 mln euro","datePublished":"2009-04-15T09:10:24+00:00","mainEntityOfPage":{"@id":"https:\/\/www.moldova.org\/en\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/"},"wordCount":206,"articleSection":["Economy"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.moldova.org\/en\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/","url":"https:\/\/www.moldova.org\/en\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/","name":"The rehabilitation of Chisinau-Hincesti road requires 13 mln euro - Moldova.org","isPartOf":{"@id":"https:\/\/www.moldova.org\/en\/#website"},"datePublished":"2009-04-15T09:10:24+00:00","author":{"@id":"https:\/\/www.moldova.org\/en\/#\/schema\/person\/e590ccdfbd35fcd038aaf1b84370dadd"},"breadcrumb":{"@id":"https:\/\/www.moldova.org\/en\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.moldova.org\/en\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.moldova.org\/en\/the-rehabilitation-of-chisinau-hincesti-road-requires-13-mln-euro-196670-eng\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.moldova.org\/en\/"},{"@type":"ListItem","position":2,"name":"The rehabilitation of Chisinau-Hincesti road requires 13 mln euro"}]},{"@type":"WebSite","@id":"https:\/\/www.moldova.org\/en\/#website","url":"https:\/\/www.moldova.org\/en\/","name":"Moldova.org","description":"The first news website of Moldova","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.moldova.org\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.moldova.org\/en\/#\/schema\/person\/e590ccdfbd35fcd038aaf1b84370dadd","name":"Autor invitat","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g","caption":"Autor invitat"},"url":"https:\/\/www.moldova.org\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/posts\/259901","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/comments?post=259901"}],"version-history":[{"count":0,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/posts\/259901\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/media?parent=259901"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/categories?post=259901"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/tags?post=259901"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}