{"id":256448,"date":"2008-11-12T13:12:00","date_gmt":"2008-11-12T13:12:00","guid":{"rendered":"http:\/\/new.moldova.org\/2008\/11\/12\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/"},"modified":"2008-11-12T13:12:00","modified_gmt":"2008-11-12T13:12:00","slug":"first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng","status":"publish","type":"post","link":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/","title":{"rendered":"First construction stage on Balti-Ungheni gas main completed"},"content":{"rendered":"<span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> &lt; 1<\/span> <span class=\"rt-label rt-postfix\">minute<\/span><\/span><p>The first constriction stage on the Balti-Ungheni high pressure main gas pipeline has been finished. The 62 kilometers of pipeline built in Sangerei and Falesti districts during the first stage will supply natural gas to 120 settlements. <\/p>\n<p>The announcement was made by the Deputy Minister of Economy and Trade Tudor Copaci at a meeting with representatives of Moldovatransgaz, Gaz Proiect and district council presidents on November 12. <br \/>\n<img decoding=\"async\" hspace=\"5\" src=\"http:\/\/reporter.md\/images\/news\/gazoduct.jpg\" width=\"220\" align=\"right\" vspace=\"5\" alt=\"\" \/><br \/>\nAccording to Copaci, 120 million lei out of the 250 million lei earmarked has been so far used to build the pipeline. <\/p>\n<p>The gas pipeline will be 126 kilometers in length. It will supply natural gas to 250 settlements in Sangerei, Falesti, Telenesti, and Ungheni districts. <\/p>\n<p>A number of 915 Moldovan settlements have been gasified until present. This is 60% of the total number of settlements. The gas pipelines existing in the country are over 5,000 kilometers in length.<\/p>\n","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> &lt; 1<\/span> <span class=\"rt-label rt-postfix\">minute<\/span><\/span>First construction stage on Balti-Ungheni gas main completed<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-256448","post","type-post","status-publish","format-standard","hentry","category-economy"],"content_social_share":"<span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> &lt; 1<\/span> <span class=\"rt-label rt-postfix\">minute<\/span><\/span><p>The first constriction stage on the Balti-Ungheni high pressure main gas pipeline has been finished. The 62 kilometers of pipeline built in Sangerei and Falesti districts during the first stage will supply natural gas to 120 settlements. <\/p>\n<p>The announcement was made by the Deputy Minister of Economy and Trade Tudor Copaci at a meeting with representatives of Moldovatransgaz, Gaz Proiect and district council presidents on November 12. <br \/>\n<img decoding=\"async\" hspace=\"5\" src=\"http:\/\/reporter.md\/images\/news\/gazoduct.jpg\" width=\"220\" align=\"right\" vspace=\"5\" alt=\"\" \/><br \/>\nAccording to Copaci, 120 million lei out of the 250 million lei earmarked has been so far used to build the pipeline. <\/p>\n<p>The gas pipeline will be 126 kilometers in length. It will supply natural gas to 250 settlements in Sangerei, Falesti, Telenesti, and Ungheni districts. <\/p>\n<p>A number of 915 Moldovan settlements have been gasified until present. This is 60% of the total number of settlements. The gas pipelines existing in the country are over 5,000 kilometers in length.<\/p>\n<div class='heateorSssClear'><\/div><div  class='heateor_sss_sharing_container heateor_sss_horizontal_sharing' data-heateor-sss-href='https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/' data-heateor-sss-no-counts=\"1\"><div class='heateor_sss_sharing_title' style=\"font-weight:bold\" ><\/div><div class=\"heateor_sss_sharing_ul\"><a aria-label=\"Facebook\" class=\"heateor_sss_facebook\" href=\"https:\/\/www.facebook.com\/sharer\/sharer.php?u=https%3A%2F%2Fwww.moldova.org%2Fen%2Ffirst-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng%2F\" title=\"Facebook\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg\" style=\"background-color:#0765FE;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M28 16c0-6.627-5.373-12-12-12S4 9.373 4 16c0 5.628 3.875 10.35 9.101 11.647v-7.98h-2.474V16H13.1v-1.58c0-4.085 1.849-5.978 5.859-5.978.76 0 2.072.15 2.608.298v3.325c-.283-.03-.775-.045-1.386-.045-1.967 0-2.728.745-2.728 2.683V16h3.92l-.673 3.667h-3.247v8.245C23.395 27.195 28 22.135 28 16Z\"><\/path><\/svg><\/span><\/a><a aria-label=\"Twitter\" class=\"heateor_sss_button_twitter\" href=\"https:\/\/twitter.com\/intent\/tweet?text=First%20construction%20stage%20on%20Balti-Ungheni%20gas%20main%20completed&url=https%3A%2F%2Fwww.moldova.org%2Fen%2Ffirst-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng%2F\" title=\"Twitter\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_twitter\" style=\"background-color:#55acee;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-4 -4 39 39\"><path d=\"M28 8.557a9.913 9.913 0 0 1-2.828.775 4.93 4.93 0 0 0 2.166-2.725 9.738 9.738 0 0 1-3.13 1.194 4.92 4.92 0 0 0-3.593-1.55 4.924 4.924 0 0 0-4.794 6.049c-4.09-.21-7.72-2.17-10.15-5.15a4.942 4.942 0 0 0-.665 2.477c0 1.71.87 3.214 2.19 4.1a4.968 4.968 0 0 1-2.23-.616v.06c0 2.39 1.7 4.38 3.952 4.83-.414.115-.85.174-1.297.174-.318 0-.626-.03-.928-.086a4.935 4.935 0 0 0 4.6 3.42 9.893 9.893 0 0 1-6.114 2.107c-.398 0-.79-.023-1.175-.068a13.953 13.953 0 0 0 7.55 2.213c9.056 0 14.01-7.507 14.01-14.013 0-.213-.005-.426-.015-.637.96-.695 1.795-1.56 2.455-2.55z\" fill=\"#fff\"><\/path><\/svg><\/span><\/a><a aria-label=\"Odnoklassniki\" class=\"heateor_sss_button_odnoklassniki\" href=\"https:\/\/connect.ok.ru\/dk?cmd=WidgetSharePreview&st.cmd=WidgetSharePreview&st.shareUrl=https%3A%2F%2Fwww.moldova.org%2Fen%2Ffirst-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng%2F&st.client_id=-1\" title=\"Odnoklassniki\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_odnoklassniki\" style=\"background-color:#f2720c;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M16 16.16a6.579 6.579 0 0 1-6.58-6.58A6.578 6.578 0 0 1 16 3a6.58 6.58 0 1 1 .002 13.16zm0-9.817a3.235 3.235 0 0 0-3.236 3.237 3.234 3.234 0 0 0 3.237 3.236 3.236 3.236 0 1 0 .004-6.473zm7.586 10.62c.647 1.3-.084 1.93-1.735 2.99-1.395.9-3.313 1.238-4.564 1.368l1.048 1.05 3.877 3.88c.59.59.59 1.543 0 2.133l-.177.18c-.59.59-1.544.59-2.134 0l-3.88-3.88-3.877 3.88c-.59.59-1.543.59-2.135 0l-.176-.18a1.505 1.505 0 0 1 0-2.132l3.88-3.877 1.042-1.046c-1.25-.127-3.19-.465-4.6-1.37-1.65-1.062-2.38-1.69-1.733-2.99.37-.747 1.4-1.367 2.768-.29C13.035 18.13 16 18.13 16 18.13s2.968 0 4.818-1.456c1.368-1.077 2.4-.457 2.768.29z\"><\/path><\/svg><\/span><\/a><a aria-label=\"Telegram\" class=\"heateor_sss_button_telegram\" href=\"https:\/\/telegram.me\/share\/url?url=https%3A%2F%2Fwww.moldova.org%2Fen%2Ffirst-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng%2F&text=First%20construction%20stage%20on%20Balti-Ungheni%20gas%20main%20completed\" title=\"Telegram\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_telegram\" style=\"background-color:#3da5f1;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M25.515 6.896L6.027 14.41c-1.33.534-1.322 1.276-.243 1.606l5 1.56 1.72 5.66c.226.625.115.873.77.873.506 0 .73-.235 1.012-.51l2.43-2.363 5.056 3.734c.93.514 1.602.25 1.834-.863l3.32-15.638c.338-1.363-.52-1.98-1.41-1.577z\"><\/path><\/svg><\/span><\/a><\/div><div class=\"heateorSssClear\"><\/div><\/div><div class='heateorSssClear'><\/div>","yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>First construction stage on Balti-Ungheni gas main completed - Moldova.org<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Autor invitat\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\\\/\"},\"author\":{\"name\":\"Autor invitat\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#\\\/schema\\\/person\\\/e590ccdfbd35fcd038aaf1b84370dadd\"},\"headline\":\"First construction stage on Balti-Ungheni gas main completed\",\"datePublished\":\"2008-11-12T13:12:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\\\/\"},\"wordCount\":144,\"image\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/reporter.md\\\/images\\\/news\\\/gazoduct.jpg\",\"articleSection\":[\"Economy\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\\\/\",\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\\\/\",\"name\":\"First construction stage on Balti-Ungheni gas main completed - Moldova.org\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/reporter.md\\\/images\\\/news\\\/gazoduct.jpg\",\"datePublished\":\"2008-11-12T13:12:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#\\\/schema\\\/person\\\/e590ccdfbd35fcd038aaf1b84370dadd\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.moldova.org\\\/en\\\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\\\/#primaryimage\",\"url\":\"http:\\\/\\\/reporter.md\\\/images\\\/news\\\/gazoduct.jpg\",\"contentUrl\":\"http:\\\/\\\/reporter.md\\\/images\\\/news\\\/gazoduct.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"First construction stage on Balti-Ungheni gas main completed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/\",\"name\":\"Moldova.org\",\"description\":\"The first news website of Moldova\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#\\\/schema\\\/person\\\/e590ccdfbd35fcd038aaf1b84370dadd\",\"name\":\"Autor invitat\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g\",\"caption\":\"Autor invitat\"},\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"First construction stage on Balti-Ungheni gas main completed - Moldova.org","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/","twitter_misc":{"Written by":"Autor invitat","Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/#article","isPartOf":{"@id":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/"},"author":{"name":"Autor invitat","@id":"https:\/\/www.moldova.org\/en\/#\/schema\/person\/e590ccdfbd35fcd038aaf1b84370dadd"},"headline":"First construction stage on Balti-Ungheni gas main completed","datePublished":"2008-11-12T13:12:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/"},"wordCount":144,"image":{"@id":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/#primaryimage"},"thumbnailUrl":"http:\/\/reporter.md\/images\/news\/gazoduct.jpg","articleSection":["Economy"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/","url":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/","name":"First construction stage on Balti-Ungheni gas main completed - Moldova.org","isPartOf":{"@id":"https:\/\/www.moldova.org\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/#primaryimage"},"image":{"@id":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/#primaryimage"},"thumbnailUrl":"http:\/\/reporter.md\/images\/news\/gazoduct.jpg","datePublished":"2008-11-12T13:12:00+00:00","author":{"@id":"https:\/\/www.moldova.org\/en\/#\/schema\/person\/e590ccdfbd35fcd038aaf1b84370dadd"},"breadcrumb":{"@id":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/#primaryimage","url":"http:\/\/reporter.md\/images\/news\/gazoduct.jpg","contentUrl":"http:\/\/reporter.md\/images\/news\/gazoduct.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.moldova.org\/en\/first-construction-stage-on-balti-ungheni-gas-main-completed-164466-eng\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.moldova.org\/en\/"},{"@type":"ListItem","position":2,"name":"First construction stage on Balti-Ungheni gas main completed"}]},{"@type":"WebSite","@id":"https:\/\/www.moldova.org\/en\/#website","url":"https:\/\/www.moldova.org\/en\/","name":"Moldova.org","description":"The first news website of Moldova","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.moldova.org\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.moldova.org\/en\/#\/schema\/person\/e590ccdfbd35fcd038aaf1b84370dadd","name":"Autor invitat","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g","caption":"Autor invitat"},"url":"https:\/\/www.moldova.org\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/posts\/256448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/comments?post=256448"}],"version-history":[{"count":0,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/posts\/256448\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/media?parent=256448"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/categories?post=256448"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/tags?post=256448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}