{"id":192124,"date":"2007-01-04T12:08:00","date_gmt":"2007-01-04T12:08:00","guid":{"rendered":"http:\/\/new.moldova.org\/2007\/01\/04\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/"},"modified":"2007-01-04T12:08:00","modified_gmt":"2007-01-04T12:08:00","slug":"moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng","status":"publish","type":"post","link":"https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/","title":{"rendered":"\u201cMoldelectrica\u201d to urgently repair damaged power networks"},"content":{"rendered":"<span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> 2<\/span> <span class=\"rt-label rt-postfix\">minutes<\/span><\/span><p>&ldquo;Moldelectrica&rdquo; State Enterprise has the necessary personnel, pillars, wires, and diesel oil in order to solve the problem of power disruption, caused by the windy weather and sleet in the last few days, stated the head of the enterprise, Marc Remes during an extraordinary meeting summoned by the Prime Minister Vasile Tarlev on Thursday, December 4. <\/p>\n<p>According to him, natural calamities affected especially the southern and the central zones of Moldova. 21 high tension lines of 110 KW and two of 330 KW have been damaged. About 380 towns and villages have been left without power. <\/p>\n<p>According to the deputy minister of Transport and Road Management, Pavel Untura, although several difficult situations have been registered on several road sectors, at the moment all the national highways are functioning properly. Efforts are focused now on ensuring the access to local roads. <\/p>\n<p>The director of &ldquo;Moldtelecom&rdquo; JSC, Gheorghe Ursachi mentioned that about 50,000 customers don&rsquo;t have access to telephone, especially in the raions of Cahul, Cantemir, and Hance&#351;ti. Ursachi promised that in maximum 2 days, all the deficiencies will be removed. <\/p>\n<p>Vasile Tarlev ordered to create a work group under the leadership of the Ministry of Industry and Infrastructure, which would travel to the most affected zones in order to mobilise all forces for the reestablishment of the energy system. He requested to work out within an hour an action plan on re-establishing electric networks &ndash; first of all of the high tension ones and than the medium and low tension networks, so that, in short time, the normal supply of electric power for all consumers is resumed. <\/p>\n<p>The PM also solicited proposals for working out a more effective reaction and action mechanism for crisis situations, as well as a strict control on the utilization of financial sources, in order to avoid abuses and embezzlement of money and materials in such situations. \/\/ Info-Prim Neo<\/p>\n","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> 2<\/span> <span class=\"rt-label rt-postfix\">minutes<\/span><\/span>\u201cMoldelectrica\u201d to urgently repair damaged power networks<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-192124","post","type-post","status-publish","format-standard","hentry","category-society"],"content_social_share":"<span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> 2<\/span> <span class=\"rt-label rt-postfix\">minutes<\/span><\/span><p>&ldquo;Moldelectrica&rdquo; State Enterprise has the necessary personnel, pillars, wires, and diesel oil in order to solve the problem of power disruption, caused by the windy weather and sleet in the last few days, stated the head of the enterprise, Marc Remes during an extraordinary meeting summoned by the Prime Minister Vasile Tarlev on Thursday, December 4. <\/p>\n<p>According to him, natural calamities affected especially the southern and the central zones of Moldova. 21 high tension lines of 110 KW and two of 330 KW have been damaged. About 380 towns and villages have been left without power. <\/p>\n<p>According to the deputy minister of Transport and Road Management, Pavel Untura, although several difficult situations have been registered on several road sectors, at the moment all the national highways are functioning properly. Efforts are focused now on ensuring the access to local roads. <\/p>\n<p>The director of &ldquo;Moldtelecom&rdquo; JSC, Gheorghe Ursachi mentioned that about 50,000 customers don&rsquo;t have access to telephone, especially in the raions of Cahul, Cantemir, and Hance&#351;ti. Ursachi promised that in maximum 2 days, all the deficiencies will be removed. <\/p>\n<p>Vasile Tarlev ordered to create a work group under the leadership of the Ministry of Industry and Infrastructure, which would travel to the most affected zones in order to mobilise all forces for the reestablishment of the energy system. He requested to work out within an hour an action plan on re-establishing electric networks &ndash; first of all of the high tension ones and than the medium and low tension networks, so that, in short time, the normal supply of electric power for all consumers is resumed. <\/p>\n<p>The PM also solicited proposals for working out a more effective reaction and action mechanism for crisis situations, as well as a strict control on the utilization of financial sources, in order to avoid abuses and embezzlement of money and materials in such situations. \/\/ Info-Prim Neo<\/p>\n<div class='heateorSssClear'><\/div><div  class='heateor_sss_sharing_container heateor_sss_horizontal_sharing' data-heateor-sss-href='https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/' data-heateor-sss-no-counts=\"1\"><div class='heateor_sss_sharing_title' style=\"font-weight:bold\" ><\/div><div class=\"heateor_sss_sharing_ul\"><a aria-label=\"Facebook\" class=\"heateor_sss_facebook\" href=\"https:\/\/www.facebook.com\/sharer\/sharer.php?u=https%3A%2F%2Fwww.moldova.org%2Fen%2Fmoldelectrica-to-urgently-repair-damaged-power-networks-23954-eng%2F\" title=\"Facebook\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg\" style=\"background-color:#0765FE;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M28 16c0-6.627-5.373-12-12-12S4 9.373 4 16c0 5.628 3.875 10.35 9.101 11.647v-7.98h-2.474V16H13.1v-1.58c0-4.085 1.849-5.978 5.859-5.978.76 0 2.072.15 2.608.298v3.325c-.283-.03-.775-.045-1.386-.045-1.967 0-2.728.745-2.728 2.683V16h3.92l-.673 3.667h-3.247v8.245C23.395 27.195 28 22.135 28 16Z\"><\/path><\/svg><\/span><\/a><a aria-label=\"Twitter\" class=\"heateor_sss_button_twitter\" href=\"https:\/\/twitter.com\/intent\/tweet?text=%E2%80%9CMoldelectrica%E2%80%9D%20to%20urgently%20repair%20damaged%20power%20networks&url=https%3A%2F%2Fwww.moldova.org%2Fen%2Fmoldelectrica-to-urgently-repair-damaged-power-networks-23954-eng%2F\" title=\"Twitter\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_twitter\" style=\"background-color:#55acee;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-4 -4 39 39\"><path d=\"M28 8.557a9.913 9.913 0 0 1-2.828.775 4.93 4.93 0 0 0 2.166-2.725 9.738 9.738 0 0 1-3.13 1.194 4.92 4.92 0 0 0-3.593-1.55 4.924 4.924 0 0 0-4.794 6.049c-4.09-.21-7.72-2.17-10.15-5.15a4.942 4.942 0 0 0-.665 2.477c0 1.71.87 3.214 2.19 4.1a4.968 4.968 0 0 1-2.23-.616v.06c0 2.39 1.7 4.38 3.952 4.83-.414.115-.85.174-1.297.174-.318 0-.626-.03-.928-.086a4.935 4.935 0 0 0 4.6 3.42 9.893 9.893 0 0 1-6.114 2.107c-.398 0-.79-.023-1.175-.068a13.953 13.953 0 0 0 7.55 2.213c9.056 0 14.01-7.507 14.01-14.013 0-.213-.005-.426-.015-.637.96-.695 1.795-1.56 2.455-2.55z\" fill=\"#fff\"><\/path><\/svg><\/span><\/a><a aria-label=\"Odnoklassniki\" class=\"heateor_sss_button_odnoklassniki\" href=\"https:\/\/connect.ok.ru\/dk?cmd=WidgetSharePreview&st.cmd=WidgetSharePreview&st.shareUrl=https%3A%2F%2Fwww.moldova.org%2Fen%2Fmoldelectrica-to-urgently-repair-damaged-power-networks-23954-eng%2F&st.client_id=-1\" title=\"Odnoklassniki\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_odnoklassniki\" style=\"background-color:#f2720c;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M16 16.16a6.579 6.579 0 0 1-6.58-6.58A6.578 6.578 0 0 1 16 3a6.58 6.58 0 1 1 .002 13.16zm0-9.817a3.235 3.235 0 0 0-3.236 3.237 3.234 3.234 0 0 0 3.237 3.236 3.236 3.236 0 1 0 .004-6.473zm7.586 10.62c.647 1.3-.084 1.93-1.735 2.99-1.395.9-3.313 1.238-4.564 1.368l1.048 1.05 3.877 3.88c.59.59.59 1.543 0 2.133l-.177.18c-.59.59-1.544.59-2.134 0l-3.88-3.88-3.877 3.88c-.59.59-1.543.59-2.135 0l-.176-.18a1.505 1.505 0 0 1 0-2.132l3.88-3.877 1.042-1.046c-1.25-.127-3.19-.465-4.6-1.37-1.65-1.062-2.38-1.69-1.733-2.99.37-.747 1.4-1.367 2.768-.29C13.035 18.13 16 18.13 16 18.13s2.968 0 4.818-1.456c1.368-1.077 2.4-.457 2.768.29z\"><\/path><\/svg><\/span><\/a><a aria-label=\"Telegram\" class=\"heateor_sss_button_telegram\" href=\"https:\/\/telegram.me\/share\/url?url=https%3A%2F%2Fwww.moldova.org%2Fen%2Fmoldelectrica-to-urgently-repair-damaged-power-networks-23954-eng%2F&text=%E2%80%9CMoldelectrica%E2%80%9D%20to%20urgently%20repair%20damaged%20power%20networks\" title=\"Telegram\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_telegram\" style=\"background-color:#3da5f1;width:100px;height:35px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M25.515 6.896L6.027 14.41c-1.33.534-1.322 1.276-.243 1.606l5 1.56 1.72 5.66c.226.625.115.873.77.873.506 0 .73-.235 1.012-.51l2.43-2.363 5.056 3.734c.93.514 1.602.25 1.834-.863l3.32-15.638c.338-1.363-.52-1.98-1.41-1.577z\"><\/path><\/svg><\/span><\/a><\/div><div class=\"heateorSssClear\"><\/div><\/div><div class='heateorSssClear'><\/div>","yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>\u201cMoldelectrica\u201d to urgently repair damaged power networks - Moldova.org<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Autor invitat\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\\\/\"},\"author\":{\"name\":\"Autor invitat\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#\\\/schema\\\/person\\\/e590ccdfbd35fcd038aaf1b84370dadd\"},\"headline\":\"\u201cMoldelectrica\u201d to urgently repair damaged power networks\",\"datePublished\":\"2007-01-04T12:08:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\\\/\"},\"wordCount\":319,\"commentCount\":0,\"articleSection\":[\"Society\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.moldova.org\\\/en\\\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\\\/\",\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\\\/\",\"name\":\"\u201cMoldelectrica\u201d to urgently repair damaged power networks - Moldova.org\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#website\"},\"datePublished\":\"2007-01-04T12:08:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#\\\/schema\\\/person\\\/e590ccdfbd35fcd038aaf1b84370dadd\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.moldova.org\\\/en\\\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u201cMoldelectrica\u201d to urgently repair damaged power networks\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/\",\"name\":\"Moldova.org\",\"description\":\"The first news website of Moldova\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/#\\\/schema\\\/person\\\/e590ccdfbd35fcd038aaf1b84370dadd\",\"name\":\"Autor invitat\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g\",\"caption\":\"Autor invitat\"},\"url\":\"https:\\\/\\\/www.moldova.org\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u201cMoldelectrica\u201d to urgently repair damaged power networks - Moldova.org","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/","twitter_misc":{"Written by":"Autor invitat","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/#article","isPartOf":{"@id":"https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/"},"author":{"name":"Autor invitat","@id":"https:\/\/www.moldova.org\/en\/#\/schema\/person\/e590ccdfbd35fcd038aaf1b84370dadd"},"headline":"\u201cMoldelectrica\u201d to urgently repair damaged power networks","datePublished":"2007-01-04T12:08:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/"},"wordCount":319,"commentCount":0,"articleSection":["Society"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/","url":"https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/","name":"\u201cMoldelectrica\u201d to urgently repair damaged power networks - Moldova.org","isPartOf":{"@id":"https:\/\/www.moldova.org\/en\/#website"},"datePublished":"2007-01-04T12:08:00+00:00","author":{"@id":"https:\/\/www.moldova.org\/en\/#\/schema\/person\/e590ccdfbd35fcd038aaf1b84370dadd"},"breadcrumb":{"@id":"https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.moldova.org\/en\/moldelectrica-to-urgently-repair-damaged-power-networks-23954-eng\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.moldova.org\/en\/"},{"@type":"ListItem","position":2,"name":"\u201cMoldelectrica\u201d to urgently repair damaged power networks"}]},{"@type":"WebSite","@id":"https:\/\/www.moldova.org\/en\/#website","url":"https:\/\/www.moldova.org\/en\/","name":"Moldova.org","description":"The first news website of Moldova","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.moldova.org\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.moldova.org\/en\/#\/schema\/person\/e590ccdfbd35fcd038aaf1b84370dadd","name":"Autor invitat","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f57d391b1fe13609c1c398a550a7b6f0e8babe6cd537d48bbeb806ba55c53094?s=96&d=mm&r=g","caption":"Autor invitat"},"url":"https:\/\/www.moldova.org\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/posts\/192124","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/comments?post=192124"}],"version-history":[{"count":0,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/posts\/192124\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/media?parent=192124"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/categories?post=192124"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.moldova.org\/en\/wp-json\/wp\/v2\/tags?post=192124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}